Reduced unplanned downtime 40% in the first six months
A regional manufacturer with no internal IT staff brought on a dedicated 36thElement engineer under a defined SLA. Proactive monitoring and patching from a named account engineer cut unplanned downtime by 40% year over year.
What we built
When you need senior engineering capacity fast — to hit a deadline, cover a skills gap, or scale a team without a six-month hiring cycle — we staff a dedicated pod led by a named US-based tech lead, not a rotating pool of contractors you never meet.
How we ran it
Scope
Define the skills gap, stack, and domain context the pod needs to move fast on day one.
Staff
A named tech lead and engineers matched and onboarded, typically within two weeks.
Integrate
The pod joins your existing sprint cadence, tooling, and code review process.
Review
Regular delivery and cost review, with flexibility to scale the pod up or down.